Skip to main content

4 docs tagged with "Path reporting time"

View All Tags

Direct Monitoring Scheme Overview

This section provides information on how evalink talos supports the native secondary to primary path failover capability provided by alarm panels. Recommendations on setting control interval values are provided.

EN 50136-1:2012 Standard and Swiss Requirements

This section provides an excerpt from the EN 50136-1:2012 standard and the A1:2018 addition to it - the regulatory documents that set the maximum connection outage times allowed for alarm panels before a failure is reported. The section also describes the additional limitations that apply in Switzerland.

Set SLA for a Virtual Receiver

Find out how to select one of the predefined SLA schemes in evalink talos and how to configure a custom SLA scheme if the default values are not suitable.