EN 50136-1:2012 Standard and Swiss Requirements

Maximum Reporting Times According to EN 50136-1:2012

The table provides an excerpt from the EN 50136-1:2012 standard and the A1:2018 addition to it.

The majority of predefined SLA options that a user can select for a virtual receiver are based on the categories set in this standard and the maximum reporting time limits defined for these categories.

SP stands for single-path, DP stands for dual-path transmitters. ATP stands for alarm transmission path.

Maximum Reporting Times for Single-Path Transmitters

Limit name in the standardControl interval nameSP2 categorySP3 categorySP4 category
Primary ATP Failure. Reporting timePath reporting time25 hr
(90 000 sec)
30 min
(1800 sec)
3 min
(180 sec)
Failure of all ATPs at the same timeSite reporting time (for SP, equals to the path failure reporting time)25 hr
(90 000 sec)
30 min
(1800 sec)
3 min
(180 sec)

Maximum Reporting Times for Dual-Path Transmitters

Limit name in the standardControl interval nameDP1 categoryDP2 categoryDP3 categoryDP4 category
Primary ATP Failure. Reporting timePrimary path reporting time25 hr
(90 000 sec)
30 min
(1 800 sec)
3 min
(180 sec)
90 sec
Alternative ATP Failure. Maximum period when primary operationalSecondary path reporting time50 hr
(180 000 sec)
25 hr
(90 000 sec)
25 hr
(90 000 sec)
5 hr
(18 000 sec)
Alternative ATP Failure. Maximum period when primary failedSecToPrim reporting time25 hr
(90 000 sec)
30 min
(1 800 sec)
3 min
(180 sec)
90 sec
Failure of all ATPs at the same timeSite reporting time25 hr
(90 000 sec)
31 min
(1 860 sec)
4 min
(240 sec)
3 min
(180 sec)

Maximum Reporting Times Specific for Switzerland

The limits below are generally based on the values of the EN 50136-1:2012.

In Switzerland, additional requirements apply: the primary path / site reporting times must not be larger than 24 hours. Other values are set according to evalink talos common practices.

Maximum reporting times for single and dual-path transmittersDP1 Sitasys optionSP2 eth / gprs Sitasys option
Primary path reporting time23 hr
(82 800 sec)
23 h
Secondary path reporting time48 hr
(172 800 sec)